What's New for Business Modeling
Основное описание

For a description of this plug-in's contents, refer to About Business Modeling.

The new features and changes from version to version are described below.

From 1.0 to 2.0.1.1

The main change has been the addition of a new package providing guidance around the requirements flowdown approach. This is a top-down approach of logically decomposing the business systems across multiple aspects driven by the chosen architectural viewpoints and views. The externally visible behavior of the business (sub) systems is modeled using the concept of operations. For more information, see the Define Business Operations Capability Pattern. 

1.0

The previous content was not packaged in a plug-in, but it was part of the base RUP.