The solutions selected for each key system function are merged to define the equipment breakdown structure. It is
assumed that the initial key system functions were independent. Thus, the final merged solution is the preferred
solution based upon the assessment criteria for the complete architecture. It will be the basis of the subsequent
architectural design activities. These design decisions are captured in the Trade Study Report along with any resulting
design constraints.
|